Director Of Data Center Construction Engineering Ai Hpc jobs in Austin – Browse 1,426 openings on RoboApply Jobs

Director Of Data Center Construction Engineering Ai Hpc jobs in Austin

Open roles matching “Director Of Data Center Construction Engineering Ai Hpc” with location signals for Austin. 1,426 active listings on RoboApply Jobs.

1,426 jobs found

1 - 20 of 1,426 Jobs
Apply
company
Full-time|On-site|Austin Area

Title: Director of Data Center Construction & Engineering (AI/HPC)Location: Austin, TX area / On-SiteReports To: CTO / VP of InfrastructureJob Type: Full-timeThe Opportunity:Join us in shaping the infrastructure that drives the future of Artificial Intelligence. We are looking for a highly experienced Director of Data Center Construction & Engineering to spearhead the comprehensive development of our state-of-the-art 50MW AI Inference Data Center. This project transcends typical colocation builds; you will be tasked with designing and executing a high-density, liquid-cooling-ready facility specifically tailored for extensive inference workloads. You will oversee the entire project lifecycle, from site master planning and permitting to commissioning and operational transfer.Key Responsibilities:1. Strategic Planning & Design Master Planning: Lead master planning for the 50MW campus, ensuring optimal power and space utilization for high-density AI compute racks (50kW–100kW+ per rack). Collaborate with compute architects to design MEP (Mechanical, Electrical, Plumbing) systems that meet the unique cooling needs of inference hardware, including Direct-to-Chip (DLC) and Rear Door Heat Exchanger (RDHx) solutions. Define appropriate redundancy levels (N+1, 2N) to meet real-time inference SLAs, balancing uptime with total cost of ownership (TCO).2. Construction & Project Delivery EPC Management: Select and oversee Engineering, Procurement, and Construction (EPC) firms, General Contractors, and subcontractors. Manage the capital budget (over $XXX M+) and master schedule, ensuring critical path activities meet deadlines without compromising safety or quality. Develop procurement strategies for long-lead equipment (generators, chillers, CDUs, switchgear) to navigate supply chain challenges.3. Power & Cooling Engineering: Foster relationships with local utility providers to secure substation delivery and ramp up power capacity to 50MW. Oversee the implementation of advanced cooling systems necessary for next-gen GPUs/TPUs, ensuring PUE (Power Usage Effectiveness) targets of less than 1.2 are achieved.4. Compliance & Safety: Ensure all designs and construction activities adhere to local building codes, environmental regulations, and safety standards (OSHA/HSE).

Feb 16, 2026
Apply
companyFluidstack logo
Full-time|$170K/yr - $200K/yr|On-site|Austin, TX

Join Fluidstack as a Data Center Construction ManagerAt Fluidstack, we are at the forefront of building the infrastructure necessary for advanced intelligence. Our partnerships with leading AI labs, governments, and corporations—such as Mistral, Poolside, Black Forest Labs, and Meta—enable us to provide computing capabilities at unparalleled speeds. We are driven by a sense of urgency to realize AGI, and our team is dedicated to delivering superior infrastructure that we take pride in. If you are passionate about purpose, strive for excellence, and are prepared to work diligently to shape the future of intelligence, we invite you to be a part of what’s next.Your RoleAs the Data Center Construction Manager, you will oversee the daily execution of green-field and brown-field GPU data center projects globally. You will be responsible for coordinating the efforts of general contractors, trades, and vendors to ensure the successful delivery of safe, timely, and budget-compliant facilities that meet Fluidstack’s rigorous power and cooling density standards.Your Key ResponsibilitiesDevelop, maintain, and implement integrated schedules (using Primavera P6, MS Project) that encompass design, procurement, construction, and commissioning phases.Uphold Fluidstack’s safety protocols; promote a zero-incident culture across all subcontractors.Coordinate CSA and MEP trades, swiftly addressing field conflicts as they arise.Monitor and report on daily progress, expenditures, earned value, and resource allocation; develop recovery plans as necessary.Ensure on-site quality assurance/control, manage material submittals, and oversee RFI and change-order processes.Collaborate with Design, Procurement, Commissioning, and Operations teams to facilitate smooth transitions.Lead the creation of scopes of work and technical documents for critical trades and packages.Manage the execution of construction contracts from award to close-out, ensuring adherence to budget, schedule, and technical specifications.Supervise contractor compliance with key deliverables, payment terms, reporting schedules, and site-specific protocols.

Jan 23, 2026
Apply
companyFluidstack logo
Full-time|$160K/yr - $250K/yr|On-site|Austin, TX

Join Fluidstack as a Data Center Project Manager - ConstructionAt Fluidstack, we're revolutionizing the infrastructure essential for advanced intelligence. Collaborating with leading AI laboratories, government entities, and major enterprises such as Mistral, Poolside, Black Forest Labs, and Meta, we are dedicated to providing computing solutions at unprecedented speeds.Our urgent mission is to make Artificial General Intelligence (AGI) a tangible reality. Our team is driven and fiercely committed to delivering top-tier infrastructure. We prioritize our customers’ success as if it were our own, taking immense pride in the systems we construct and the trust we cultivate. If you are passionate about purpose, obsessed with excellence, and ready to work diligently to enhance the future of intelligence, we invite you to help us shape what comes next.Role OverviewAs the Data Center Project Manager - Construction, reporting directly to the Data Center Construction Director, you will spearhead the planning, budgeting, and risk management processes for Fluidstack’s global data centers. By collaborating closely with the Construction and Design teams, you will transform ambitious capacity objectives into actionable project plans, ensuring all stakeholders remain aligned from project initiation to customer handover.Key ResponsibilitiesDevelop integrated schedules using Primavera P6 and MS Project, overseeing the execution of the master construction schedule from site mobilization through substantial completion and turnover.Manage project budgets, cash flow forecasts, and change order processes while reporting earned-value KPIs on a weekly basis.Facilitate phase-gate and 30/60/90% design reviews, maintaining RACI matrices and action logs for clarity and accountability.Oversee contract lifecycles, including RFPs, bid analysis, awards, PCO tracking, and close-out documentation.Identify critical-path and long-lead risks (e.g., transformers, chillers, switchgear) and implement effective mitigation strategies.Serve as the primary source of truth for internal leadership and external partners, providing clear and concise status reports.Offer strategic direction and leadership to cross-functional project delivery teams, including project managers, construction managers, and superintendents.Develop staffing plans, oversee performance management, and promote talent development within the project organization.Lead project standups, reviews, and retrospectives to foster accountability and continuous improvement.Ideal CandidateBachelor’s degree in an engineering discipline, with preference given to candidates with relevant experience in large-scale construction projects.Proven track record in managing complex construction projects, demonstrating strong leadership and organizational skills.Excellent communication skills, both written and verbal, with the ability to articulate project needs and statuses effectively.Strong analytical skills with a focus on data-driven decision making.Experience with risk management and budget oversight in a construction environment.

Jan 17, 2026
Apply
companyFluidstack logo
Full-time|$250K/yr - $300K/yr|On-site|Austin, TX

About FluidstackAt Fluidstack, we are at the forefront of building the compute, data centers, and power systems that will drive the evolution of artificial superintelligence. Collaborating with industry leaders such as Anthropic, Google, Meta, AMI Labs, and Black Forest Labs, we aim to deploy gigawatts of compute at unparalleled speeds. Our commitment to investing tens of billions in U.S. infrastructure is set to materialize with a 1GW deployment in 2026 and 10GW in 2027.Our team is compact, agile, and dedicated to delivering excellence. We take ownership of outcomes, challenge the status quo, and embrace our customers' challenges as our own. Here, no task is too small for anyone.Join the few thousand individuals who will influence the future of superintelligence.About The RoleAs the Lead Mechanical Engineer, you will serve as a senior technical authority within Fluidstack’s Design and Engineering team. Your mission is to establish the mechanical cooling strategy and oversee the design process from chip to chiller across multiple sites housing some of the world's largest AI data centers.This role is pivotal, requiring you to set the technical vision for cooling tens of thousands of GPUs through both air-cooled and liquid-cooled setups, chilled water systems, heat rejection methodologies, and innovative thermal management solutions. You will define the specifications for modular, prefabricated mechanical assemblies, ensuring rapid deployment and adaptability for future compute needs. Additionally, you will lead a growing team of mechanical engineers and collaborate with electrical, controls, structural, and construction teams to deliver cutting-edge cooling infrastructure swiftly and efficiently.We have recently unveiled a $50 billion partnership with Anthropic to develop custom data centers in New York and Texas with additional locations on the horizon. This position will be instrumental in shaping the mechanical systems that make such ambitious projects feasible.

Apr 12, 2026
Apply
companyDigitalOcean logo
Full-time|On-site|Austin

Join DigitalOcean as a Senior Data Center Engineer II, where you will play a crucial role in managing and optimizing our data center operations. You will be responsible for ensuring the reliability, performance, and scalability of our infrastructure, working closely with cross-functional teams to drive improvements and implement best practices.

Apr 1, 2026
Apply
companyTurner Townsend logo
Full-time|On-site|Austin

Role overview Turner Townsend is hiring a Senior Quantity Surveyor / Cost Manager to join projects in Austin focused on data center construction. This role centers on financial oversight for major builds, balancing budget control, scheduling, and quality requirements. What you will do Create detailed cost estimates and budgets for each data center project. Lead feasibility studies and carry out risk assessments for new developments. Collaborate with project teams to track and report on financial performance at every stage. Negotiate contracts with suppliers and subcontractors, aiming for favorable terms. Requirements Proven experience in cost management within the construction sector. Background working on data center or other large-scale construction projects is highly valued.

Apr 22, 2026
Apply
companyFluidstack logo
Full-time|$200K/yr - $250K/yr|On-site|Austin, TX

About FluidstackFluidstack is at the forefront of creating infrastructure for advanced intelligence. We collaborate with leading AI laboratories, government entities, and notable enterprises such as Mistral, Poolside, and Meta to deliver computing solutions at unprecedented speeds.Our mission is to turn Artificial General Intelligence (AGI) into a reality. Our dedicated team is driven by a sense of urgency and a commitment to excellence, ensuring that we provide our customers with top-tier infrastructure. We share a deep sense of responsibility for the outcomes of our clients, taking pride in the systems we develop and the trust we cultivate. If you're passionate about purpose, driven to achieve excellence, and eager to contribute to the future of intelligence, we invite you to join us in shaping what lies ahead.

Apr 1, 2026
Apply
companyNatera logo
Full-time|$217.1K/yr - $271.4K/yr|Remote|US Remote

Role Overview In the role of Director of Data & AI Governance, you will spearhead the development and execution of comprehensive data management strategies across the enterprise. Your leadership will ensure that we maintain safe, compliant, and high-quality data and AI practices. You will supervise Data Governance, AI Governance, and Data + AI Stewardship, acting as the key authority on policies, forums, and controls across various sectors including R&D, Lab Operations, Commercial, and SG&A. By advocating for a robust data management strategy, you will guide the Data & AI Governance Council effectively. This position transcends traditional policy implementation; it demands expertise in constructing frameworks, deploying code-based controls, and embedding governance within engineering workflows. Your governance responsibilities encompass quality, privacy, security, agentic automation, AI risk management, bias and fairness testing, evaluations, and vendor AI assessments. Key Responsibilities Governance Council & Operating Model Develop and implement an enterprise-wide data management strategy and operating model, ensuring consistent execution across all departments. Lead and operationalize the AI & Data Governance Council, fostering decision-making and accountability across legal, regulatory, compliance, IT, security, engineering, and product domains. Establish a federated stewardship model that empowers business units to take ownership of their data while ensuring compliance and consistency through governance. Create governance forums (steering committees, working groups, architecture boards) to drive clear outcomes and enhance data management.

Feb 2, 2026
Apply
companyFluidstack logo
Full-time|On-site|Austin, TX

Fluidstack seeks a Data Center Structural Engineer based in Austin, TX. This role centers on designing and implementing structural systems that support the company’s data center infrastructure. The work plays a direct part in maintaining the reliability and performance of Fluidstack’s facilities. Key responsibilities Develop structural solutions for both new and existing data center buildings Oversee project implementation, ensuring all work meets structural integrity requirements and complies with relevant standards Work closely with engineering colleagues and project teams to help maintain smooth data center operations

Apr 21, 2026
Apply
companyFluidstack logo
Full-time|$130K/yr - $160K/yr|On-site|Austin, TX

Join Fluidstack as a Data Center SuperintendentAt Fluidstack, we are pioneering the infrastructure that fuels abundant intelligence. Collaborating with esteemed AI laboratories, governmental bodies, and enterprises such as Mistral, Poolside, and Meta, we are on a mission to deliver computing power at unprecedented speeds.Our commitment to making Artificial General Intelligence (AGI) a reality drives our team to work diligently and purposefully. We take immense pride in our infrastructure and the trust we build with our clients, treating their success as our own. If you are passionate about making a meaningful impact, dedicated to excellence, and eager to contribute to the future of intelligence, we invite you to join our innovative team.About the RoleAs the Data Center Superintendent, you will play a pivotal role in overseeing the construction of hyperscale GPU data centers that support leading AI labs including Anthropic and Google. You will be directly responsible for managing large-scale, mission-critical construction projects from inception to completion. Your responsibilities will include daily site operations management, coordination of trades and subcontractors, compliance with safety and quality standards, and ensuring project timelines are met under tight deadlines. This is a high-responsibility position integral to Fluidstack's infrastructure development.

Mar 18, 2026
Apply
companyAECOM logo
Full-time|On-site|Austin

Join AECOM as an Estimating Manager specializing in Data Centers. In this pivotal role, you will lead a team of estimators in developing and delivering accurate estimates for complex data center projects. Your expertise will be crucial in ensuring that our estimates align with client expectations and project specifications.Key responsibilities include overseeing estimating processes, collaborating closely with project managers and clients, and providing mentorship to junior team members. You will be part of a dynamic environment where your skills in project management and cost analysis will be utilized to the fullest.

Feb 18, 2026
Apply
companyFluidstack logo
Full-time|$150K/yr - $250K/yr|On-site|Austin, TX

Join Fluidstack as Our Senior Data Center Physical Security EngineerAt Fluidstack, we are pioneering the infrastructure that fuels abundant intelligence. Collaborating with leading AI laboratories, governments, and enterprises such as Mistral, Poolside, Black Forest Labs, and Meta, we are committed to unlocking compute capabilities at lightning speed.We are driven by a sense of urgency to realize artificial general intelligence (AGI). Our team is dedicated, passionate, and focused on delivering top-tier infrastructure. We view our customers' successes as our own, taking immense pride in the systems we construct and the trust we cultivate. If you are motivated by a meaningful mission, strive for excellence, and are prepared to work diligently to accelerate the future of intelligence, we invite you to join us in constructing what lies ahead.Role OverviewAs the Senior Data Center Physical Security Engineer, you will spearhead the design and implementation of a robust multi-layer physical security framework that safeguards Fluidstack’s most critical asset—our data. Your responsibilities will encompass everything from perimeter fortification to rack-level tamper detection, all seamlessly integrated within a zero-trust monitoring system. You will lead initiatives to protect AI infrastructure against the most sophisticated adversaries globally.Key ResponsibilitiesOversee all facets of security systems for data centers, ensuring coordination with all other discipline requirements.Devise and execute strategies for the design and deployment of data center security systems.Assist in the development and enforcement of security system standards in compliance with US DoD and international standards.Consult on design specifications, master drawings, and legal documentation.Engineer access control, CCTV, intrusion detection, and biometric systems in alignment with SOC 2 and ISO 27001 standards.Develop zoning and mantrap layouts, authentication flows, and visitor management SOPs.Specify encryption and retention policies for video footage, logs, and alarms.Integrate security events with DCIM and corporate SIEM platforms.Promote resilience through dual-path communications and battery backup, along with regular penetration testing programs.Ideal CandidateA minimum of 10 years' experience designing hyperscale, enterprise, or mission-critical physical security systems.Extensive knowledge of ONVIF, SIA DC-09, OSDP, Wiegand, and BACnet standards.Hands-on experience with Genetec, LenelS2, Honeywell, or Avigilon ecosystems.

Jan 28, 2026
Apply
companyDigitalOcean logo
Full-time|On-site|Austin

Join our innovative team as a Senior Data Center Engineer II at DigitalOcean in Austin, Texas. In this dynamic role, you will be responsible for maintaining and optimizing our data center operations, ensuring high availability and performance of our cloud infrastructure. You will work closely with cross-functional teams to implement best practices and drive continuous improvements in our processes.

Apr 6, 2026
Apply
companySEON Technologies Inc. logo
Director of AI Engineering

SEON Technologies Inc.

Full-time|On-site|Austin

SEON stands at the forefront of fraud prevention and AML compliance, empowering thousands of companies globally to combat fraud, mitigate risks, and safeguard their revenue. Utilizing over 900 real-time, first-party data signals, SEON enhances customer profiles, identifies suspicious activities, and optimizes compliance processes—all from a single platform. With superior data quality, transparent analysis, and rapid value delivery, SEON outperforms competitors in the market. Our partnerships with renowned digital brands such as Revolut, Wise, and Bilt have enabled clients to reduce fraud by 95% and achieve an impressive 32x ROI. As we continue to expand, we are looking for innovative leaders to join our mission.In the role of Director of AI Engineering, you will spearhead our AI-driven innovation and engineering initiatives across all locations. This includes establishing an applied research group, steering strategic AI projects that align with our vision to become the premier AI-driven command center for risk and compliance teams, and leveraging cutting-edge technologies to enhance our fraud prevention solutions and deliver exceptional value to our clients.Your responsibilities will encompass building and nurturing a skilled team of AI engineers and data scientists, guiding the strategic direction of our data initiatives towards making SEON an AI-centric organization. This role requires close collaboration with various departments to embed data-driven decision-making and AI capabilities throughout the company, thereby playing a crucial role in our swift growth and transformation.

Feb 23, 2026
Apply
companyRenesas Electronics Corporation logo
Full-time|On-site|Austin

Renesas Electronics Corporation is hiring a Chief of Staff to work alongside the Vice President of HPC Hardware Engineering in Austin. This role partners with executive leadership to keep projects moving forward across the high-performance computing hardware group. Key responsibilities Work with the VP to manage priorities and monitor progress on major initiatives in the HPC hardware engineering division Promote clear communication and collaboration between teams to support company goals Look for ways to simplify operations and improve processes Help teams and projects stay aligned with the company’s vision Location This position is located in Austin.

Apr 28, 2026
Apply
companyFluidstack logo
Full-time|On-site|Austin, TX

Join Fluidstack - Pioneers in Intelligence InfrastructureAt Fluidstack, we are at the forefront of building the infrastructure that will support the future of artificial intelligence. We collaborate with esteemed AI laboratories, governmental bodies, and leading enterprises such as Mistral, Poolside, Black Forest Labs, and Meta to deliver computing capabilities at unprecedented speeds.Our mission is to expedite the realization of Artificial General Intelligence (AGI). Our team is composed of driven individuals committed to crafting world-class infrastructure. We prioritize our clients' success as if it were our own, taking immense pride in the systems we create and the trust we build. If you are passionate about purpose, dedicated to excellence, and eager to work hard to shape the future of intelligence, we invite you to join us in this transformative journey.Role OverviewThe Architect position is a pivotal role within Fluidstack's Data Center Design and Engineering team. You will lead the architectural workstream for a diverse portfolio of data center developments across multiple sites and states, overseeing the process from initial concept through design, permitting, and completion of construction.This is an owner/developer position where you will manage external architects and engineers, coordinate efforts across civil, structural, and MEP disciplines, and engage with general contractors, authorities having jurisdiction, and operational stakeholders. You will serve as the subject matter expert in building envelope design, life safety protocols, spatial planning, and code compliance for some of the largest data center campuses currently under development.

Mar 19, 2026
Apply
companyFluidstack logo
Full-time|$200K/yr - $250K/yr|On-site|Austin, TX

Join Fluidstack as a Commissioning Engineer for Data Center Cooling SystemsAt Fluidstack, we are at the forefront of creating infrastructure that empowers the future of intelligence. Our partnerships with leading AI labs, governmental bodies, and major enterprises like Mistral, Poolside, and Meta drive us to unlock computing capabilities at unprecedented speeds. Our mission is to make Artificial General Intelligence (AGI) a reality, and we need talented individuals who share our passion for excellence and innovation.As a Commissioning Engineer, you will play a crucial role in leading the installation and commissioning of Data Center Cooling Distribution Units (CDUs). Your expertise in liquid cooling systems will guide all phases of commissioning, ensuring that our infrastructure meets the highest standards of performance and safety. If you are ready to take on this challenge and contribute to the acceleration of intelligence technology, we want you on our team!

Apr 1, 2026
Apply
companySB Energy logo
Full-time|$140K/yr - $165K/yr|On-site|Austin, Texas

About SB Energy SB Energy, based in Redwood City, CA, develops, builds, owns, and operates large-scale energy and data center infrastructure across the United States. Backed by SoftBank and Ares, the company has grown rapidly since 2019, now operating over 3 gigawatts (GW) with a multi-GW pipeline underway. SB Energy integrates advanced technology, including an AI-driven digital platform, to deliver local and reliable energy solutions tailored to demand. The team is committed to accelerating the transition to cleaner, more sustainable power sources and shaping the future of energy and technology. Role Overview: Lead Building Engineer for Data Center Operations Location: Austin, Texas The Lead Building Engineer for Data Centers plays a central role in keeping all electrical, mechanical, and fire/life safety systems running at peak efficiency to ensure 100% uptime. This position is the primary point of accountability for data center facility operations, responsible for preventative maintenance, corrective actions, and emergency response. Key Responsibilities Oversee day-to-day facility operations within the data center, ensuring all critical systems remain fully functional. Supervise a team of Critical Facilities Engineers (CFEs), including work order management, training, event coordination, and performance oversight. Act as the main technical resource for onsite Engineering Operations Technicians (EOT) and third-party vendors. Direct maintenance and operational strategies, including Method of Procedures (MOP) development, testing protocols, spare parts management, capital planning, and equipment lifecycle planning. Lead and participate in technical work as needed, maintaining a hands-on approach to facility operations. Communicate with customers and internal teams to coordinate activities and address operational needs. What Success Looks Like Reliable facility operations with zero unplanned downtime. Well-trained, high-performing engineering team. Effective risk management and operational excellence across the site. Reporting Structure This position reports to the Director of Operations. Who Thrives Here This role is ideal for an experienced professional with a strong background in critical facilities management who demonstrates leadership and a commitment to operational excellence. A hands-on approach and the ability to direct complex technical operations are essential.

Apr 28, 2026
Apply
companyExowatt logo
Full-time|On-site|Austin, TX

About Exowatt At Exowatt, we are pioneering the future of energy for the AI era with our innovative P3 system that captures solar energy, stores it as heat, and produces electricity on demand. Established in 2023 and backed by renowned investors like Andreessen Horowitz, Sam Altman, and Felicis, we are dedicated to delivering clean, modular, and scalable power solutions that address the increasing demands of AI infrastructure. Our mission is to ensure sustainable renewable energy is consistently available and nearly free, fostering technological growth while safeguarding our planet. About the Role We are on the lookout for a passionate Data Center Engineering Project Manager to spearhead the implementation of cutting-edge data center projects. In this role, you will collaborate with our talented Exonauts and external contractors to design, build, and manage Exowatt's next-generation, high-efficiency modular DC platform. You will take projects from initial concept through to production, working closely with our energy, software, and operations teams to deliver exceptional modular data center products.

Aug 26, 2025
Apply
companyExowatt logo
Full-time|On-site|Austin, TX

About Exowatt Exowatt is at the forefront of transforming the energy sector in the AI era with our innovative P3 system, designed to capture solar energy, store it as heat, and produce electricity on demand. Established in 2023 and supported by prominent investors such as Andreessen Horowitz, Sam Altman, and Felicis, we are dedicated to delivering sustainable, modular, and scalable energy solutions that address the growing requirements of AI infrastructure. Our goal is to ensure that renewable energy is perpetually accessible and nearly free, facilitating technological progress while safeguarding our planet. About the Role We are on the lookout for an Engineering Director to spearhead the design and development of state-of-the-art data center systems. This role is highly technical and demands significant ownership, positioned at the convergence of mechanical and electrical engineering, IT infrastructure, thermal modeling, and manufacturing. You will oversee designs from conception to production, collaborating intimately with our energy, software, and operations teams to deliver premier modular data center products.

Dec 19, 2025

Sign in to browse more jobs

Create account — see all 1,426 results

Tailoring 0 resumes

We'll move completed jobs to Ready to Apply automatically.